Modern Custom Manufacturer Double Glazed Tempered Glass Black Windows Hurricane Impact Aluminum Sliding Window Windows Houses

Product Description

Product Presentation

■Product Description

Product Image 1
Product Image 2

■Details Images

Profile style Aluminium sliding window
Aluminum Surface finshing Powder coated, Electrophoresis, Anodize and PVDF
Aluminium color option RAL Series, and Wood Grain, two option for inward and outward color
Glass option 1. Single glazing: 5MM, 6MM, 8MM, 10MM
2. Double glazing: 5MM+9A+5MM, 6MM+19A+6MM
3. Triple glazing: 5MM+6A+5MM+6A+5MM
4. Laminated glass: 4MM+0.76PVB+4MM
Glass style: Tempered glass, Low E glass, refective glass, frosted glass, laminated glass and so on (can install mini-blinds between glass)
Detail Image 1
Detail Image 2
Detail Image 3

■Company Profile

Company Facility 1
Company Facility 2

■FAQ

Q1 Are you a factory or Trading company?
Topbright established in 2012, with 3 production bases, a total of 300,000 Square feet, a window door, and Curtain wall manufacturing factory which located in Guangzhou, where the city held the Canton fair twice a year. A warm welcome to visit our company, just 45-minute drive from the Airport.
Q2 Can we use our own door design?
Yes, Topbright offers the design-built-ship-install guide service, for commercial project customers and dealers. Based on the project's local situation, our engineering team designs the product with fix solution to meet the project's requirement, from drawing to production, Topbright covers you all.
Q3 Where is your factory located and how can I visit you?
We are located in Guangzhou city. After you arrive at Guangzhou airport, we can pick you up there.
Q4 What information is needed to order parts for my product?
It is important to have as much detailed information as possible. Proper measurements for sash/panel replacement, as well as your product series number are necessary for us to place an order for you. If needed, visual aides, such as emailing pictures of your product, can also be of assistance.
Q5 What's the production time?
We will start to make the production after we get deposit. Normally, it needs around 45 days for producing.

■Recommend Products

Related Products