Modern Style Aluminum Double Tempered Frosted Glass Bathroom/Bedroom/Toilet Door Manual Opening for Hotels

Product Description

Product Details
Aluminium French Doors Overview
Thermal Break Profile Design
Custom Glazing Options
Door Structure and Craftsmanship
Installed View French Doors
Item Aluminium French Doors
Brand Foshan NF
Material T6063-5 thermal break aluminiuim profile
Thickness 2.0mm thickness thermal break aluminium profile
Glass
A. Glass thickness 5mm/6mm/8mm
B. Double tempered glass 5mm+20A+5mm
C. Triple tempered glass 5mm+9A+5mm+6A+5mm
D. Laminated/Lowe/Reflective /Tinted Glass
Surface treatment Powder Coating, Anodized, Wooden Grain, PVDF Coating
Color Customized design color
Application Residential, Villas
Number of door leaves Single or Double
Delivery Time 35 days
Certification AS2047, CE, CSA, NFRC
Company Profile
Company Facility and Workshop
Production Process and Quality Standards
Frequently Asked Questions
What material and profile thickness are used for these doors?
The doors are engineered using high-performance T6063-5 thermal break aluminium profiles with a robust structural thickness of 2.0mm.
What types of glass configurations are available?
Available glazing configurations include single glass (5mm/6mm/8mm), double tempered glass (5mm+20A+5mm), triple tempered glass (5mm+9A+5mm+6A+5mm), and laminated, Low-E, reflective, or tinted glass.
What surface treatments and color options can be selected?
We offer powder coating, anodized, wood grain, and PVDF coating finishes. All colors can be customized according to architectural requirements.
Can the door be configured with single or double leaves?
Yes, the doors are available in both single-leaf and double-leaf configurations, making them versatile for residential properties and luxury villas.
What international quality certifications do these doors meet?
Foshan NF aluminium French doors comply with rigorous standards and hold official certifications including AS2047, CE, CSA, and NFRC.
What is the standard production and delivery lead time?
The standard production and delivery timeframe is approximately 35 days upon specification confirmation.

Related Products